Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Dynamic balancing for pump impeller 045-P-101A/B/C/D

Dynamic balancing for pump impeller 045-P-101A/B/C/D

View more
Supply cold cutting service for 24" pipe line HHPS- STG4

Supply cold cutting service for 24" pipe line HHPS- STG4

View more
Fabrication, installing water supply pipes across Vam Co Dong river

Fabrication, installing water supply pipes across Vam Co Dong river

View more
Repairing Boiler and auxiliary equipment - 2022

Repairing Boiler and auxiliary equipment - 2022

View more
Overhaul and maintenance of 12U100 technology air compressor system

Overhaul and maintenance of 12U100 technology air compressor system

View more
Online leak sealing for 2" pipeline welds

Online leak sealing for 2" pipeline welds

View more