Dynamic balancing for pump impeller 045-P-101A/B/C/D
Dynamic balancing for pump impeller 045-P-101A/B/C/D meets G1.0 ISO 1940 standard
Other Projects
On-line leak sealing for 110-PV-0034 valve
Online Leak sealing for CO Coal Gas Pipeline
Turbine Overhaul ST01101 - Gas Generation Plant
Design, processing, manufacturing, and installation of rotary kiln body
Online leak sealing at 0.75-inch water stagnant discharge line