Overhaul turbine, generator and auxiliary equipment Unit 2
Repair, maintenance, overhaul of turbine, generator and furnace auxiliary equipment No. 2:
- Turbine repair and maintenance: Disassemble, repair, maintain, alignment, reinstall.
- Blasting by aluminum powder to clean turbine rotors and diaphragms.
- Repair and maintenance of 60MW generator.
- Repair and maintenance of Stop valve, Steam Turbine Regulating Valve system.
- Repair and maintenance of oil pumps, oil coolers, etc.
Other Projects
Online leak sealing at 0.75-inch water stagnant discharge line
Fabrication, installing and renovating ventilation system 11kV
Repair and maintenance for Turbine Unit 2
Repair and maintenance of Circulating Fan
Online leaking sealing for valve body 3" class #2500